Article Index

Emblematic image  of the Bath: the roofing of the thermal pool was made in 2011

Oil drilling exploration was started on 21st July 1955.The first drilling was done with a 22-meter high tower called: Maszolaj. The following drilling was started on 3rd of Sept. and it was 465 meter deep in October. A ”strange accident” happened on 9th of Oct. at about 2 pm.